|
|
Problem
-
Minimize unplanned shutdowns of gas turbine engines to ensure peak production for off shore platform operations.
-
Loss of engine capacity result is in revenue loss of $7,000 per hour plus loss of productive labor during unscheduled outage. | 
|

|
Using NormNet®
-
Real-time, continuous monitoring of engines and compressors on a 7 x 24 basis.
-
Platform operators receive early warning of abnormal conditions,
averting unexpected shutdowns and reducing cost and time of repairs.
-
Savings projected at $150,000 per year per engine. |
|